| Client |
M/S G.K. BioEnergy Pvt Ltd
and Asia BioEnergy Ltd. |
| Project |
To prepare a detailed project report and
discuss with Government of India for subsidy |
| Role |
Consultants for the following
services |
|
1. Evaluation of candidate technologies for Pulping
and biomethanation |
|
2. Design of biomethanation plant to generate
1.2 MW of power |
|
3. Design of organic manure drying and
packing system |
|
4. Establishing the financial viability
of the proposal |
|
5. Esatabilishing the reliability of the
recommended technology |
|
6. Estabilishing the reliability
of the imported components |
|
7. Personal Presentatin to the Government
of India Ministry |
|
8. Assisting the client to develop the project
implementation plan |
|
9. Adjust the implementation plan to suit
the GOI guidelines |
|
10. Document the foregoing into a record
|
|
Project Financial Aspects |
|
| Total cost
of Project |
INR 154 Million |
| Income from
sale of power at 85% of fuel capacity |
INR 24 Million per year |
| Income from
sale of organic manure |
INR 34 Million per year |
| Total of
income per year |
INR 59 Million per year |
| Internal
Rate of Return(IRR) for the project |
26.4% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Status |
The assignment was sanctioned by the GOI
in December 2000.
The construction is nearing completion |
|
Result |
The financial viability of the proposal
is furnished above. |
|
|
|
|
|
|
|
|