| Client |
M/S AFSA Tanning Company
Pvt. Ltd. |
| Project |
Complete project management from concept
to commissioning |
| Role |
Consultants for the following
services |
|
1. Characterization of the raw effluent |
|
2. Developed process design, layout,
hydraulics, structural drawings. |
|
3. Identification of vendor and negotiating
equipment quality and price |
|
4. Construction supervision of the civil
and piping systems & valvings |
|
5. Establishing a pipeline architecture
with aesthetic appeal and utility |
|
6. Inspection and certification
of equipments at factory and on site |
|
7. Construction supervision and project
interim appraisals to client |
|
8. Development of biological culture and
establishing the MLSS |
|
9. Commissioning of the plant and demonstration
of the evloved process |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Status |
The assignment started in Sept 1999 and
completed in Sept 2000. |
|
Result |
The plant is now in full treatment capacity
with the following results: |
| Parameters |
BOD
|
COD |
pH |
SS |
TDS |
Colour |
Sulphide |
| Raw
effluent |
800
/ 1200 |
2000
/ 3000 |
4.6
/ 5.6 |
800
/ 1000 |
5000
/ 6000 |
Varies |
nil |
| Treated
effluent |
5
/ 10 |
120
/ 140 |
8.2
/ 8.3 |
50
/ 70 |
as
above |
faint |
nil |
|
|
The getup is like a VIP guest house set in
a Coconut grove and uses a footprint of 30m X 9m only
The architecture permits the plant indoor air quality
to be easily rendered to international standards |
|
|
|
|
|
|
|
|