Rehabilitation of city water treatment plant polluted by sewage in its water source at Hosur

   

Client M/S T V S Motor Company, Hosur and Tamilnadu Water Supply and Drainage Board
Project The water source was an impoundment in a dam, which was polluted by sewage from upstream habitation. The existing WTP had clariflocculator and rapid sand filter and was unable to handle this water source, which was having algae growth and the WTP was shut down for 3 years between 2000-2003. M/S CEC studied the situation rehabilitated the WTP by converting to high Lime and carbonation and yielded water certified by the state health authority and accepted by the local public in 2004
Role Project Managers sponsored by M/S T V S Motor Company We charged only the actual costs incurred by us.
1. Characterization of existing water source
2. Sampling and treatability on laboratory scale
3. Bench scale laboratory study
4. Developing treatment process configuration
5. Developing the retrofit with existing WTP
6. Vendor identification and wetting equipment specifications
7. Supervision of erection
8. Inspection and certification of equipments and off-site deliveries
9. Certifying specific supplies and site off-loads
10. Interactions with client, civil and equipment contractors & local authority
11. Supervision of construction, trial run, test run and commissioning
Status The assignment started in December 2003 and was commissioned on March-22-2004, the World Water Day.
Results

In a place where groundwater is at 300 m depth, drinking water was given to the public after three years of tormenting sufferings without it.


   