| Client |
Indo-German Environment
Programme, Govt of Germany |
| Project |
Relocation of the 100 industries away
from the city in a new location as a eco friendly project
with complete recovery of metals and reuse |
| Role |
Consultants for preparing
the feasibility study. |
|
1. Characterization of existing industrial
effluents |
|
2. Treatability studies of effluents
on membranes |
|
3. Formulating options for metal recoveries
by membranes Vs Ion Exchange technologies |
|
4. Interaction with German technology
support group |
|
5. Meeting with end users and arriving
at acceptable technologies |
|
6. Arranging for demonstration of membrane
based metal recoveries at the nearby installations in
the plating shop of M/S BHEL, for whom M/S CEC designed
and provided the system in 2000. |
|
7. Presentation of the report to Pollution
Control Board and GOI and getting the No Objection Certificate |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Status |
The NOC has since been received and the
Metal Platers Association is trying to get the financial
closure. |