Multi Storied Textile Effluent Chemical Treatment in Wattala Industrial Estate, Sri Lanka


This ETP treats 1500 cubic meters of dyeing effluent per day and its footprint is 20 m x 5m only. It rises to 29 m above ground level and has 6 floors in which all the unit operations as chemical preparation, chemical dosing, clariflocculation, storage, R O membrane desalination, permeate storage, reject storage and sludge dewatering in Decapress are all housed. The neatness of execution of pipe architecture in the dosing section may be seen.

Client Melbourne Textiles Washing Plant (P)Ltd
Project ETP for Textile Effluent
Role Project Management Consultants for
1. Study of existing practices of in-house generation of effluents
2. Effluent sampling, analysis and statistical validation of design basis
3. Laboratory treatability study for desalination
4. Laboratory batch scale multi stage precipitation studies and establishing dosages
5. Developing treatment process for potential zero discharge upgrade later
6. Demonstration of technologies in pilot plants
7. Preparation of tender document and evaluation of tenders
8. Inspection and certification of equipments and off-site deliveries
9. Certifying specific alignments of high speed centrifuge systems
10. Interactions with client, civil and equipment contractors & P C Board
11. Supervision of construction, trial run, test run and commissioning
Status The ETP has been commissioned in August 2005 and the RO segment will be taken up in 2006.

   