Home | Site Map | Contact Us
Site Search
 
 
Capability in Treatment Plant Project Management


360,000 liters per day capability Treatment Plant


Client Shansun Chemicals and Drugs Limited, Pondicherry
Project Project Management Consultants from concept to commissioning to identify a treatment process with potential for future zero discharge capability
Role Consultants for the following services

1. Study of existing practices of in-house generation of effluents
2. Effluent sampling, analysis and statistical validation of design basis
3. Laboratory treatability study for bacterial metabolism and kinetics
4. Developing treatment process for potential zero discharge upgrade later
5. Development retrofit to existing ETP, layout and hydraulics for new ETP
6. Identifying desalting technoligies for zero discharge enhancements
7. Devising the stepwise implementation programme in stages
8. Preparation of tender document and evalutionof tenders
9. Inspection and certificates of equipments and off-site deliveries
10. Certifying specific alignments of high speed centrifuge systems
11. Interactions with client, civil and equipment contractors & P C Board
12.Supervision of construction, trial run, test run and commissioning
Status The assignment started in 2000 and has been completed upto activity 11 above.
Results The results of treatment are forecast as under:

Parameters BOD COD pH SS Sulphide Colour Odour
Raw effluent 500 / 550 16000Max 4.1 to 7.8 700 / 750 Trace Varying Intense
Treated effluent 20 / 30 As occurs 7.5 / 8.3 40 / 50 nil Colourless BDL

The entire ETP is accommodated in a footprint of 30 m x 12m and is a single storied structure
The process is designed as a multistage chemical treatment to sustain to varying raw effluent quality
   

Home ~ Personnel ~ Projects ~ Profile ~ Services