Water Resourcing Feasibility Study


4 Million liters per day Water Resourcing Options Feasibility
for cooling water for Cast Iron Pipe Manufacturing

Client Lanco Infrastructure Ltd, Chennai
Project To review alternative water resourcing technologies for cooling and boiler water
Role Consultants for the following services

1.Characterization of present practices of water abstraction
2. Evaluation of existing water abstraction systems
3. Evaluation of reliability of present resources
4. Laboratory studies on nearby raw sewage potential
5. Estimating reliability of raw sewage as a source
6. Tentative treatment process indentification
7. Estimating approximate costs of renovation
8. Report preparation on treatment scheme and costing
9. Clarifying the doubts of client on sewage reuse
Status The assignment started in June 2001 and was successfully completed in July 2001.
Results

The study identified the distinct possibility of taking in the nearby city sewage to the extent required and its treatment to yield a clear, odourless and pathogen free water of uniform quality of water as against drawing underground water from nearby river basin which is not perennial and which has a very shallow aquifer of limited depth.

The forecast results of sewage renovation are as under:
Parameters BOD COD pH TDS Colour Odour SS
Raw effluent 200 / 300 350 / 500 7.3 / 7.9 700 / 1400 Light Grey Sewage 400 / 600
Treated effluent nil 20 / 30 Neutral <400 nil nil nil

The proposal is likely to open new Vistas of sewage reuse prospects in this region and avoid second grade use of a first grade fresh water
   